• CZCX-III Asphalt Mixture Rutting Specimen Molding Machine
CZCX-III Asphalt Mixture Rutting Specimen Molding Machine
+
  • Details
  • Basic Introduction to Molding Machines

    1. Safety Warning;

    This molding machine is a safe and reliable piece of equipment. Our company cannot anticipate errors or accidents that may arise from improper operation or unexplained usage. Therefore, if any special operating procedures are not outlined in this manual, please consult our company first to determine whether such use is permissible.
    Before each work session, check the guide rails for foreign objects; they should be kept clean and lubricated with oil. While the molding machine is running, do not touch any moving parts; avoid wearing loose-fitting clothing or jewelry to prevent scratches and potential injury.
    When removing the casing to troubleshoot mechanical faults, be sure to disconnect the power supply.
    This instrument must be properly grounded to ensure the operator’s safety.
    When operating the instrument, ensure that the support feet are fully grounded.
    In the event of any abnormal situation, please immediately cut off the power and contact our company without delay.

    2. Note:

    Be sure to read the user manual carefully before using this instrument. In particular, the safety operating instructions are especially important.
    When operating this instrument, keep the operation manual in an easily accessible location.
    This manual contains important safety instructions for using this instrument, essential safety warnings, basic parameter settings, frequently asked questions, and a complete operating procedure.
    Failure to read the operating manual and using the instrument blindly may result in damage to the equipment or injury to personnel.
    The precautions for labeling must be observed to ensure proper instrument operation.

    3. Rated Power Supply Output:

    This instrument operates on a three-phase four-wire system with a power rating of 3 kW, where the black wire serves as the neutral line.

    4. Introduction:

    This molding machine is manufactured by our company using advanced international technology, and it has seen significant improvements over comparable instruments in terms of operational safety, ease of use, instrument durability, noise control, heat dissipation, and energy management.
    The wheel width of this rutting tester is 300 mm, and the compaction line load is 300 N/cm.
    In terms of instrument safety, the instrument control box is equipped with an emergency switch; when an emergency occurs, toggling this switch will immediately halt all ongoing operations.
    The technical standards for this equipment comply with the industry standard of the People’s Republic of China: JTG 3410—2025.

    5. Key Technical Specifications

    Compaction line load control range: 200–400 N/cm (factory default setting: 300 N/cm).
    Compaction line load control accuracy: ±5 N/cm.
    Temperature control range: 50 ~ 200 ℃ (factory default setting: 100℃)
    Temperature control accuracy: ±5 ℃.

    Number of steps 12 times/min ± 1 time/min
    Specimen size 300×300×50 (100) mm
    Roller radius × width Radius 500 mm, width 300 mm
    Trial vehicle speed 6 round trips / minute
    Roller pressure 0–20 kN adjustable (factory setting: 9.0 kN)
    Roller temperature 0–200°C
    External dimensions 1100×600×1800mm
    Weight 410KG
    Power Requirements Three-phase four-wire
    Power 3KW

    6. Components and Accessories:

    Power switch: Located on the left side of the control box.
    Temperature controller: Used to control temperature.
    Counter: Used to control the number of times the vehicle moves.
    Oil pump start/stop knob: Controls the operation of the oil pump.
    Roller Lift Up/Down Buttons: Control the roller’s lifting and lowering.
    Car Operation Stop Button: Controls Car Operation
    Mold stopper: For securing the test mold.

    7. Unpacking and Inspection:

    Upon receiving the instrument, it should be accompanied by a complete factory certificate and relevant documentation.
    Check whether the following accessories are included:
    Molding machine One unit
    Trial mold block One piece
    Standard mold One
    Check that the above components are intact; if any damage is found, contact the carrier and manufacturer immediately!

    Start operation

    1. Unpacking and Installation:

    Remove all shipping restraints and take the equipment off the wooden pallet.
    Note: The instrument is relatively heavy; be extremely careful when disassembling or reassembling it to avoid personal injury or damage to the equipment.
    The product shipping cartons must be properly stored for future transportation use.
    Move the device to a fixed location, ensuring that the instrument is stable and essentially level.
    The equipment should not be placed directly against the wall; sufficient maintenance space must be left.

    2. Control Unit:

    Connect the power supply properly. Confirm that the power supply is three-phase four-wire, with the black wire serving as the neutral line. After connection, use a meter to verify that the installation is correct.

    3. Power On:

    Turn the emergency stop rotary knob to the right to power on the unit; at this point, both the temperature controller and the counter will display readings. Rotate the oil pump on/off knob to the right to energize the oil pump, then turn the roller plate lift/lower knob— the roller plate should be able to move freely up and down. Press the trolley travel button, and the trolley will move freely back and forth.

    4. Settings:

    To set the temperature, press the left arrow button on the temperature controller; the decimal point will start flashing in the SV field. Press the up or down arrow keys to adjust the digit corresponding to the flashing decimal point. The PV field displays the measured value. The temperature will automatically begin to heat up.
    To set the number of steps, press the left arrow button on the counter. Press the up or down arrow buttons to adjust the corresponding digit; once you’ve made your selection, wait a few seconds for the setting to be saved automatically. The rightmost button is the reset button.

    Experiment begins

    1. Specimen Placement

    After the temperature stabilizes, install the test specimen and secure it tightly.
    Note: When placing the test mold, the cart must be positioned in the middle of its travel range; otherwise, it should be adjusted.

    2. Adjust the temperature

    If the temperature isn’t quite accurate, you can adjust the temperature sensor up or down.
    Note: Do not apply excessive force when tightening.

    3. Start the experiment

    Start the oil pump, lower the roller to the descending position, reset the counter to zero, and press the trolley start button to begin operation. The experiment is now underway.

    4. Experiment completed

    After the experiment ends, the cart automatically stops; once the roller is raised to the top position, it shuts down, and the oil pump also stops.

    5. Remove the specimen

    Pull the specimen out smoothly, clean up the newspaper and compacted debris around the specimen, and use a rammer to gently tap down any uneven areas as needed.

    6. Clean up

    After the test specimen is removed, clean the trolley guide rail thoroughly and apply lubricant.

    Testing and Debugging

    1. Load Adjustment

    After using the molding machine for a period of time, pressure calibration is required to ensure the accuracy of the experiments.

    Service

    The molding machine requires only minimal maintenance. To reduce damage to moving parts, it is essential to perform regular cleaning and lubrication—especially cleaning and lubricating the guide rails.

Introduction


Cangzhou Aihua Instrument Technology Co., Ltd. (Abbreviation: Aihua Instruments) is a specialized enterprise providing material mechanics performance testing equipment, asphalt testing equipment, concrete testing equipment, and geotechnical testing equipment. Headquartered in the Chengdong Development Zone, Xian County, Cangzhou City, Hebei Province, the company is a technology-driven enterprise integrating the research and development, production, sales, and service of fully automated intelligent testing equipment.

Currently, the company supplies a wide range of products from stock, leveraging competitive pricing, proactive and customer-focused service, and a market-oriented approach. Every stage of the process is strictly controlled, with rigorous quality assurance applied to each product. The company is committed to continuous improvement, innovation, and excellence. Additionally, a comprehensive pre-sales and after-sales service system has been established.

Product Display
Factory environment
Workshop environment
Production environment

FAQ


Can you accept small quantities?

Yes, accept small quantity, fast delivery

Do you have pre-shipment inspection procedures?

Yes, we always test the products before delivery.

Can I take samples for testing?

Yes, samples can be sent for testing before bulk ordering.

When is the delivery time?

Inventory orders within 7-15 days, for oem and odm orders, the specific time depends on the actual situation.

What are the terms of payment?

Wire transfer or letter of credit, Western Union, Alipay, etc.

Can I have my own custom product?

Yes. oem and odm can be provided, including design, logo, packaging, etc.


  • CZCX-III Asphalt Mixture Rutting Specimen Molding Machine
CZCX-III Asphalt Mixture Rutting Specimen Molding Machine
+

CZCX-III Asphalt Mixture Rutting Specimen Molding Machine

This molding machine is manufactured by our company using advanced international technology, and it has seen significant improvements over comparable instruments in terms of operational safety, ease of use, instrument durability, noise control, heat dissipation, and energy management.

Are you still hesitating? Just come and get the samples now! Contact us!

Our Advantages

Integrated R&D and Manufacturing

We control the entire process from innovation to delivery, specializing in the development, production, and servicing of fully automated intelligent testing equipment.

Comprehensive Product Portfolio

We provide professional testing solutions across four key fields: Material Mechanics, Asphalt, Concrete, and Geotechnical engineering, meeting diverse industry and research needs.

Quality Assurance and Fast Delivery

Every product undergoes strict quality control throughout production. With ready stock and a strategic location near major transport links, we ensure reliable and timely delivery.

Full Lifecycle Customer Support

We offer end-to-end service—from pre-sales consultation to after-sales support—driven by a customer-first approach and a commitment to continuous innovation.

Payment and Distribution

T/T  L/C

★ If your order is not large, we can send it to you via TNT, DHL, UPS or EMS, etc.

★ If your order is large, we would recommend that you use air or sea freight through the freight forwarder you specify. We also have long-term cooperative agents.

7 to 10 working days

Product Display
Factory environment
Workshop environment
Production environment
Factory
Workshop

Get A Quote

Note: Please leave your email, our professionals will contact you as soon as possible!

Request a Quote

Please complete this form, and we will contact you by the next business day.

SUBMIT
%{tishi_zhanwei}%